NEW SOIL STACK & AIR ADMITTANCE VALVE INSTALLED
Another drainage upgrade completed by Drain Scout. 💧
✅ Old soil pipework removed
✅ New black soil stack installed
✅ Air admittance valve fitted
✅ New connections & fittings
✅ Neat, professional installation
✅ Fully tested on completion
📍 Covering Southport, Formby, Ormskirk, Liverpool, Crosby, Chorley & Leyland & surrounding areas.
🚨 24/7 Drainage Specialists
💧 Drain Scout – Available 24/7 to Keep You Flowing
Before:
After:
The existing soil pipework was removed and replaced with a new black soil stack, complete with new fittings and an air admittance valve (AAV) to help maintain correct air pressure within the drainage system.